RAHMAWATI, RAHMAWATI (2022) ANALISA KINERJA BIAYA DAN WAKTU DENGAN METODE EARNED VALUE ANALYSIS PADA PROYEK REHABILITASI DAN PENINGKATAN BENDUNG MODULAR TILEY. Sarjana thesis, Universitas Khairun.
|
Text (RAHMAWATI)
01 COVER.pdf - Published Version Download (239kB) |
|
|
Text (RAHMAWATI)
06 ABSTRAK.pdf - Published Version Download (256kB) |
|
|
Text (RAHMAWATI)
BAB I.pdf - Published Version Download (282kB) |
|
|
Text (RAHMAWATI)
DAFTAR PUSTAKA.pdf - Published Version Download (240kB) |
| Item Type: | Thesis (Sarjana) |
|---|---|
| Uncontrolled Keywords: | Kata Kunci : Kinerja, Biaya Dan Waktu, Earned Value |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas > Teknik sipil Fakultas > Teknik sipil Fakultas > Teknik sipil |
| Depositing User: | Sucandri Mawardani |
| Date Deposited: | 11 Aug 2022 04:48 |
| Last Modified: | 01 May 2023 06:29 |
| URI: | http://digilib.unkhair.ac.id/id/eprint/1001 |
Actions (login required)
![]() |
View Item |

